Find the land
Road access for big rigs, water, soils for septic, flat ground, and a reason to stay nearby.

How to start a campground in the order the decisions come: the land, zoning and the health license, utilities, the site mix, what it costs, what each site earns, and how the seasons shape the year. With a business plan outline you can copy.
To start a campground business, find land with good road access, a water source and soils that pass septic tests, then confirm with the county that zoning allows a campground and what the state or county campground license requires. Budget electric, water and sewer per site, choose a mix of RV, tent and cabin sites, and write a business plan with occupancy and nightly rates month by month before you build. Most new parks build in phases and add sites once the first ones fill.
Road access for big rigs, water, soils for septic, flat ground, and a reason to stay nearby.
Planning office first, then the health department. Get approvals before you build.
Electric, water and sewer per site decide most of the budget.
RV full hookup, water and electric, tent, cabins and glamping, each with its own rate and season.
Rates, occupancy by month, startup and running costs, and the loan you need.
Open with the sites and bathhouse you need, then add more once they fill.
Reservations, deposits, the camp store, cleaning and who is on call at night.
Road access for big rigs, water, soils for septic, flat ground, and a reason to stay nearby.
Planning office first, then the health department. Get approvals before you build.
Electric, water and sewer per site decide most of the budget.
RV full hookup, water and electric, tent, cabins and glamping, each with its own rate and season.
Rates, occupancy by month, startup and running costs, and the loan you need.
Open with the sites and bathhouse you need, then add more once they fill.
Reservations, deposits, the camp store, cleaning and who is on call at night.
What to look for
How much land
A rule of thumb used by Good Sam Campground Solutions is about 10 sites per acre, before roads, buffers, the bathhouse and the office. So 40 sites need at least 4 usable acres, and your zoning setbacks may push that higher. Land averages around $3,000 an acre nationally in the same source, and it quotes TRUiC’s range of $1,000 an acre for land with a lot of unusable ground to upwards of $10,000 for flat waterfront land or land with outstanding views.
Zoning and health licensing are usually two separate approvals, and you need both. Rusk County, Wisconsin, lays out the order clearly, and it is a good model of what to expect elsewhere:
Rules vary a lot. Some counties have no zoning at all: Good Sam’s zoning guide gives Pulaski County, Kentucky, as an example, while coastal California cities are strict. Where zoning doesn’t allow a campground, you may be able to apply for a variance or a rezoning, usually with a public hearing where neighbors speak. Many places also require a certificate of occupancy for buildings such as the office and bathhouse.
This is general information, not legal advice. Ask your county planning office and health department what applies to your land, and get it in writing.
Utilities decide most of the budget, and sewer swings it the most. These figures come from Good Sam Campground Solutions and the sources it quotes, published in January 2022; get current local bids before you commit.
| Item | Cost reported | Notes |
|---|---|---|
| Full-hookup site, built from scratch | About $15,000 per site | One owner’s cost for full hookups, gravel roads and pads |
| Site with more amenities | $15,000 to $50,000 per site | Estimate from Home is Where You Make It |
| Electric pedestal | $1,500 to $2,500 per site | 15, 30 and 50 amp service |
| Well, 150 feet | About $5,500, up to $12,000 | Plus up to $25 per foot of piping |
| City water hookup | About $1,200 per site | One owner’s quote |
| Site-by-site septic | Upwards of $40,000 in total | Tank, leach field and piping |
| Dump station instead of sewer at each site | Up to 75% less | Lower nightly rates than full hookups |
| Bathhouse | About $20,000 | Guests rate clean restrooms highly |
| Office | $15,000 to $80,000 | $100 to $550 per square foot |
| Internet equipment | About $3,000 | Routers and Wi-Fi repeaters |
| General liability insurance | $450 to $1,500 a year per $1 million of cover | TRUiC estimate |
| Buying an existing campground instead | $100,000 to $2 million or more | TRUiC estimate, plus renovations |
Good Sam’s shortcut is acres × 10 sites × $15,000. For 40 sites that is $600,000 in site work, before land, the bathhouse, the office and buildings. At $50,000 a site it is $2 million. The SBA 7(a) program guarantees loans of up to $5 million that can pay for real estate, buildings and equipment.
| Site type | What it needs | Good for |
|---|---|---|
| Full-hookup RV, back-in | Electric, water and sewer at the site | Long stays, snowbirds, monthly guests |
| Full-hookup RV, pull-through | More space and road, so fewer sites per acre | Overnight travelers, big rigs |
| Water and electric RV | A dump station on site | Lower build cost, weekend campers |
| Tent, drive-in or walk-in | A flat pad, a fire ring, a table, a short walk to the bathhouse | Families, the lowest cost per site |
| Cabins | A building, often with its own permits | The longest season, the highest rate |
| Glamping units | Platforms, furnishing, sometimes power and water | High rates in a short season |
RVs dominate bookings. On RoverPass, RV sites took 79.4% of reservations in 2025, tents 10.0%, cabins 6.8% and glamping 0.3%. Cabins and glamping are the fastest-growing: cabin bookings grew 15.3% and glamping 43.6% from 2024 to 2025. If you plan glamping units, our guide on how to start a glamping business covers the units and their permits.
Average nightly rates on RoverPass in 2025, by park size:
| Park size | 2024 | 2025 |
|---|---|---|
| Small, under 50 sites | $59.65 | $64.85 |
| Medium, 50 to 99 sites | $69.12 | $83.00 |
| Large, 100 sites or more | $80.03 | $95.00 |
Campgrounds on Campspot ran 24.7% in January 2025, averaged 34.8% over the 12 months to March 2025, and reached 44.5% from April to June 2026. Campspot counts occupancy as occupied sites divided by active sites. Our occupancy benchmarks explain why a seasonal park should measure only the nights it is open.
On RoverPass, June, July and August held 40.8% of 2025 reservations, while January, February and December together held 11.9%. Most stays are short: 85% ran one to seven nights in 2025, and Campspot’s median stay was three nights. RoverPass also saw 15.2% of reservations cancelled in 2025, so write a deposit and cancellation policy before you open.
An example, not a forecast. A 40-site park open all year has 14,600 site nights. At 35% occupancy, close to Campspot’s 12-month figure, it sells 5,110. At the small-park average of $64.85 that is about $331,000 in site revenue, or $22.70 per available site night. The same park open May to October has 7,360 site nights; at an assumed 50% it sells 3,680, about $239,000. Subtract staff, utilities, insurance, booking fees, repairs and the loan payment month by month, including the months you are closed.
Copy this outline. Lenders, partners and your county will ask for most of it.
To run the numbers, use our business plan and profit calculator with your own site count, rates and season, and write your deposit and cancellation policy before the first booking.
Most campgrounds sell RV and tent sites online through a campground reservation system, often with listing sites on top. Lodery isn’t built for that: it has no online booking engine or channel manager. It fits camps and lodges with cabins where guests book by phone or email and stays include meals or guided activities, keeping each cabin by night with deposits and the camp store on the bill. See cabin booking software, pricing, or start free.
For more questions, write to us.
Site work alone runs about $15,000 per full-hookup site in one owner’s report, and up to $50,000 with more amenities, so 40 sites cost $600,000 to $2 million before land and buildings. Buying an existing campground runs from $100,000 to $2 million or more.
A rule of thumb is about 10 sites per acre before roads, buffers and buildings, so 40 sites need at least 4 usable acres. Pull-through sites, larger rigs and zoning setbacks all push that up.
On RoverPass, nightly rates averaged $64.85 at small parks and $95 at large parks in 2025. At 35% occupancy over a full year, a $64.85 site earns about $8,300 a year before costs.
They can be, but rates, occupancy and the season decide it, and sewer and electric costs decide how long payback takes. Build a monthly plan with conservative occupancy, and open in phases so revenue starts before every site is built.
In most places, yes: zoning or land-use approval, state or county approval of water and sewer plans, a campground license from the health department, and building permits for the bathhouse and office. Rules vary by county.
Summer. On RoverPass, June, July and August held 40.8% of 2025 reservations, while December to February held 11.9%. Sunbelt parks see more winter guests, often on longer stays.
Updated

A walkthrough of the staff app with your own questions: rooms, guides, the kitchen and the bill.
Book a demoWe keep improving the staff app. See what shipped in each release.
Read the changelog